Nobody asks what an annual statement costs until they have received a number and want to know whether it is reasonable.
The problem is that the number only means something against the building. Two statements at the same price can represent completely different amounts of work.
What drives the cost?
Five variables.
The number of measures on the schedule. The biggest factor. A building with twelve measures requires twelve assessments; a building with forty requires forty. The schedule is the scope of works, which is why it is the first thing anyone should ask for. What the schedule is and how to read it is covered in Fire Safety Schedule explained.
The size and layout of the building. A single-level warehouse and a thirty-storey tower can have similar measure counts and vastly different site time, because of access, travel between levels and the number of separate zones.
Access constraints. Basements, plant rooms, ceilings, roof spaces and secure areas all add time. So does out-of-hours attendance, which some buildings require.
Whether a competent fire safety practitioner is required. Where the assessment must be carried out under that framework, the cost structure differs.
Travel and scheduling. Distance from the contractor’s base and how the visit fits with other work in the area both affect price, which is why a contractor based near the building often quotes lower without cutting anything.
Why is a quote without the schedule guesswork?
Because the schedule is the only document defining what is being assessed.
A quote given over the phone before the schedule has been read is either based on an assumed building type or priced to win the job and revised later. Neither is useful to a committee trying to budget.
The professional sequence is: obtain the schedule, confirm the measures, confirm access, then price. A contractor willing to skip the first step will likely discover the difference later.
If the building does not have a copy of its schedule, that is the first task rather than a quoting problem. It comes from the council that issued the development consent.
What does a cheap statement usually leave out?
Four things, and they are consistent.
The measures that are hard to reach. Plant rooms, roof spaces and basements take time. A statement that assessed everything accessible and inferred the rest has not assessed the building.
The measures known to fail. If a previous report flagged a door, a statement that does not mention it again is either a building that was fixed or a building that was not looked at.
Proper records. A statement produced without itemised findings behind it is a signature rather than an assessment.
The practitioner requirement. Where one applies and has not been addressed, the statement may not be valid for its purpose regardless of what was charged.
The pattern is that the saving is made in time on site, not in margin.
What does a statement cost to get wrong?
More than the difference between quotes.
A statement that discloses a failure creates a record. That record may trigger council follow-up, affect insurance, or complicate a sale. A statement that does not disclose a failure it should have found is worse, because the liability does not disappear.
Then there is timing. A defect found with weeks of runway is a maintenance job. The same defect found during statement preparation is a disclosure, and rectification afterwards happens under pressure at premium rates. That argument is in why fire safety inspections are non-negotiable.
How do you get a fixed price?
Three steps.
Send the schedule. Nothing else substitutes for it.
State the access position honestly. Basements, ceilings, plant rooms, after-hours requirements, and anything that has changed since the last assessment.
Ask what is included and what the deliverable looks like. A quote specifying the measures covered and the report format is comparable. One that says “AFSS preparation” is not.
For a strata building the additional question is whether the quote covers common property only or any lot-level measures appearing on the schedule. That distinction catches committees regularly.
Is a template a substitute for an assessment?
No, and this is worth being clear about.
A template can help a building understand what a statement contains and what the practitioner needs. It cannot assess a measure. The assessment is the substance; the form is the record of it.
Buildings asking for a template are usually trying to understand the document they have been handed, which is a reasonable question worth answering directly. But a template filled in without an assessment is not a statement.
Frequently asked questions
How much does an annual fire safety statement cost?
It varies with the number of measures on the schedule, building size, access, whether a competent fire safety practitioner is required, and travel. There is no fixed fee, and any quote before the schedule is seen is an estimate.
Why can’t I get a price over the phone?
Because the scope is defined by the Fire Safety Schedule, not by building type. A price without it is based on assumption and will usually change once the measures are known.
What is included in an assessment?
Each measure on the schedule is assessed against the standard it must meet, and the results recorded. The statement is prepared from those results and lodged with council.
Does a cheaper statement mean less work?
Usually yes. The saving is typically made in site time, meaning inaccessible areas are inferred rather than assessed, or previous findings are not rechecked.
Do I need a competent fire safety practitioner?
It depends on the building class and the measures. Where the requirement applies, it is confirmed at the start of the engagement rather than at lodgement.
Where do I get my Fire Safety Schedule?
From the council that issued the development consent, or the building’s records if a previous managing agent held them. Without it the scope cannot be defined.
Can I use a template to prepare my own statement?
A template helps you understand the document but cannot perform the assessment. The statement rests on an assessment of each measure, and that is the part carrying the obligation.
What happens if the statement is late?
The obligation continues and the exposure increases. Late lodgement is a compliance issue in its own right, separate from any defect the building may have.